POWERFUL AND EFFECTIVE DISRUPTION ASSESSMENTS

System Dynamics is the best option to assess the most complex and most heavily disrupted projects, because:

  • It addresses 100% of the overruns caused.
  • It establishes a clear causal link between events and their ultimate project impact.
  • Its assessments are 100% consistent with all known project information.
  • It can separately estimate the disruptive impact of each event / group of events.

DYNAMIC DISRUPTION AND DELAY ANALYSIS (D3A)

D3A, based on the System Dynamics methodology, accurately reproduces the performance of your project (‘As Built’ simulation), producing the most robust, most consistent and most plausible explanation of what happened on the project, and why it happened.

And then, by simply removing the client’s events from the simulation, D3A shows how your project would have performed in the absence of disruptive events (‘But For’ simulation.)

A FULLY VALIDATED APPROACH

SUCCESSFUL IN ARBITRATION

“The Tribunal finds that the System Dynamics analysis is appropriate and that its findings are supported by evidence. Accordingly, the Tribunal accepts its conclusions .”
Excerpt from an international arbitration award

POWERFUL IN NEGOTIATION

“[System Dynamics] was instrumental to the successful settlement of our claim.”
Area Managing Director
USD 250 million oil and gas subcontract

ACCEPTED BY THE

SOCIETY OF CONSTRUCTION LAW

SCL “Delay and Disruption Protocol”
(2nd Edition, 2017), p.47.
© Construction Dynamics Solutions L.L.C. 2018

Privacy Preference Center

Necessary

This website uses technical cookies, customization and analysis, own and third-party, to anonymously facilitate navigation and analyze statistics on the use of the Web.

_gat,_ga,_gid,gdpr[allowed_cookies],gdpr[consent_types]